Skip to content

Tender notice

Forestry England - Whinlatter Hydroelectric Power Scheme

Notice details

Published
Category
works
Buyer region
South West

Public buyer

Tender valueNot disclosed

  1. Planned start
    As published in the notice
  2. Planned end
    As published in the notice

Work description

Forestry England (FE) has developed a scheme for the installation of a small-scale, high head hydropower system, with the maximum possible generating capacity (expected to be circa 140kW) within Whinlatter Forest, Cumbria. The purpose of the scheme is to transfer the Whinlatter site into a carbon free, net energy producer. An outline scheme has been granted planning permission, consisting of an inlet structure, penstock, turbine house and outlet, with electrical connections into both the Whinlatter Visitor Centre and into Thornthwaite, for export to the National Grid. Detailed design is currently in progress for the overall scheme with the turbine specification and requirements set out below. This tender is for the award of a Contract for the design, manufacture, supply, installation, commissioning and the planned and reactive maintenance of a suitable turbine. The maintenance service will be for an initial period of five years post commissioning.

Related awards

Source: Contracts Finder · Notice b1bef633-e01e-4e2b-8203-372bdb00194e-341076

View source notice