Awarded
Wynn Brook Flap Valve
£57,905
works
Contract Details
- Tender Value
- £57,905
- Stage
- Awarded
- Published
- Awarded
Timeline
Start
Awarded
Disclosed
End
Description
The flap gate at Wynn Brook, Chigwell Road, Woodford Green has been disconnected from the frame. This is affecting the operational condition of the asset. Repair works are required to bring the asset to recommended operational condition The flap gate is still on site but not in place. In the current, damaged condition the flap gate is susceptible to back flow in high water level conditions from the River Roding. The objective of the works is to bring the existing asset to its intended standard of service. This will be done by reinstalling the flap gate with new bracketry and security features.
Related Contracts
From This Buyer
From This Supplier
In This Category
- Provide the Fit Out of 1st Floor of Waterdale, Doncaster DN1 3BU
- Fencing in Public Park and Open Spaces within Taunton
£57,000 ·
- Estates Capital Project- LittleBrook Anti-Ligature Doors and Associated Hardware
£35,371 ·
- Consultancy re. Replacement of Roof and Solar Panels at Cranleigh Health Centre
£98,415 ·
Ref: 46a4fff5-dc43-4ce9-9de0-9b2a982f0426-826666 · Sourced from Contracts Finder
View source notice