# T0630 Lower Thames Crossing - Family of Structures Solutions Definition

> Contract award record from UK public-sector procurement sources.

## Key facts

- Public buyer: [National Highways](/buyers/national-highways/contract-awards)
- Contract winner: [SPaTS Atkins and CH2M Joint Venture](/contract-winners/spats-atkins-and-ch2m-joint-venture/public-sector-contract-awards)
- Award value: £402,042
- Tender value: £402,042
- Award date: 25 October 2024
- Published: 25 October 2024
- Contract start: 25 October 2024
- Contract end: 31 March 2025
- Stage: awarded
- Procurement category: services
- Notice ID: 818ef4d3-41f7-41fb-9972-8f9eebce9fb6-797314
- OCID: ocds-b5fd17-b2184a0e-6e5c-49a9-9cc8-508c966647ed

## Description

The objective is to take forward the great work undertaken during the MS4 Preliminary/Outline Design phase, and the associated knowledge and learning, forward to develop the preliminary design for the most challenging category of structure on the project, the Super Portal Gantry\. The ability to maintain the demonstrable first principles of the architectural solution will ensure consistency of form and continuity of the road user experience throughout the Lower Thames Crossing corridor\. In addition, other key objectives as follows:- - Derisk the delivery schedule by working closely with all key stakeholders to ensure alignment of timescales is completely clear\. - Develop a very robust scope of works for the wider family of structures and capture the specific design requirements for Lower Thames Crossing\. E\.g\. DCO constraints, verge widths, VRS considerations, User Charging requirements, operational requirements\. - To gain clarity of the approvals required during the design development process\. E\.g\. PTSG, SES AIP discussions - Futureproofing - Making sure that the solutions developed are suitable/scalable for the future needs of the corridor\.

## Related contract awards

- [PDF - Framework - A120 Horsley Cross - Parkeston Rbt Harwich Safety Impt](/contracts/ocds-b5fd17-17b0789c-c4e1-4d50-acd5-06e497aace8c): National Highways
- [PDF Framework - A27 Falmer Footbridge Headroom](/contracts/ocds-b5fd17-ac2eb537-ce78-41bb-8f91-d6d652725e96): National Highways
- [PDF Framework - RM1016 Holyport interchange](/contracts/ocds-b5fd17-c92e4616-bb2e-4533-8dce-53b55a72aa09): National Highways
- [S30089 Future Asphalt Surface Course Linking to NH Net Zero - Phase 4](/contracts/ocds-b5fd17-b9dd26ab-a224-4c8a-af55-33231b22d9ec): National Highways Limited
- [T0688 TRST3064 Update of the publication: Well Managed Highways Code of Practice](/contracts/ocds-b5fd17-66d712c7-d334-4ab3-b54d-248dfe60ac70): National Highways
- [T0656 M5 Wynhol Viaduct Renewal Scheme](/contracts/ocds-b5fd17-2eefd94b-f9c4-471e-b027-c61042fc3df8): National Highways

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/818ef4d3-41f7-41fb-9972-8f9eebce9fb6-797314)
