Queen Camel Parish Council Playground Project
£127,500
Contract Details
- Tender Value
- £130,000
- Stage
- Awarded
- Published
- Awarded
Timeline
Description
Queen Camel Parish Council is seeking a suitably qualified and experienced contractor to design and deliver new playground equipment, surfacing and associated works at the Playing Field. The site is located near the Tennis and Bowling Clubs, with parking at each end, to the northwest and southeast of the play area. Additionally, there are two main entry points for pedestrians, and access can be made from across the main field for those walking to the site. The work includes all the existing equipment to be removed which is at the end of its practical life. With mature trees on one side and a mound at one end, the objective is to utilise the large open space to create a well-designed and a relatively accessible site. It should be noted that some of the external funding will be specifically for 'Inclusive' elements which needs to be finalised once a preferred design is selected. It will utilise materials low in maintenance, mainly steel and engineered wood while complementing the natural surrounding area. Please download all the documentation, review and provide a response by the due date and time.
Related Contracts
From This Supplier
- Design and Install a Playground at Hall Park 3, Burneside LA9 6QF via ESPO Framework 115_25 Lot 1
£50,000 ·
- Playground and Gym Equipment - Servicing and Maintenance
£54,515 ·
- Play areas
£34,794 ·
- Provision of Inspection Reports & Repairs of Play Equipment (Including Surfacing) & Outdoor Sports Direct Award through Lot 15: Inspection Reports Play Equipment (Including Surfacing) and Outdoor Sports of ESPO Outdoor Playground, Fitness & Sports Facilities & Equipment 115_21 Framework Agreement
£62,192 ·
Ref: c1d43cd4-fcbb-476b-aa78-716a376207eb-740259 · Sourced from Contracts Finder
View source notice