ContractPulse
Awarded

Internal Alterations at Bilston Fire Station

£59,339

Contract Details

Tender Value
£59,339
Stage
Awarded
Published
Awarded

Timeline

Awarded
Start
End
Disclosed

Description

The works will generally consist of the following: stripping out of the existing boiler room, kit drying room and B.A. services room and making good. Structural repairs and support to form two new store rooms and cycle store room. Construction of a new gymnasium and new boiler room to encapsulate the repositioned heating boiler within the existing appliance bay. Form a new kit drying room and B.A. services room within the existing locker room area, including new foul water drainage connections. The formulation of new shower rooms at first floor level within the former first floor gymnasium, including new foul water drainage connections. The location of the works is as follows: Bilston Fire Station Prosser Street Bilston West Midlands WV14 0QA

Related Contracts

Ref: ad44c400-f5bc-4fe9-a904-e7c23460b32b-98285 · Sourced from Contracts Finder

View source notice