Area 6 Drainage
£683,482
Contract Details
- Stage
- Awarded
- Published
- Awarded
Timeline
Description
Works include 6 schemes with drainage works as follows: Scheme 1: A59 Skipton Road - The works include clearing the overgrown vegetation from the existing ditch and its surroundings, cleaning out existing gullies and the pipe work connections that outfall into ditch and repairing the damaged ditch sides. Scheme 2: Shaw Lane - The works include pavement haunching, providing unlined drainage grips and concrete lined drainage grips with kerbs and reinstatement of verges followed by grass seeding. Scheme 3: Low Green Darley - Replace 150mm dia drain pipe and reconstruct the Carriageway and Footway, Verge build up at some locations Matching the Existing Layers, Replace the iron works and associated civil works across all sites. Scheme 4: Weeton Lane - Undertake carriageway resurfacing and setting up gully connection along with the adjustment. Scheme 5: York Road - Replace 150mm dia drain pipe and reconstruct the carriageway and footway matching the existing layers and replace the iron works and associated civil works across all sites. Scheme 6: Ripon Road, Wormald Green - The works include replacing a 150mm dia. carrier pipe with 225mm dia. carrier pipe, installation of 2No additional 150mm dia. Drain pipes and connecting to 225mm dia. Carrier pipe. Reconnection of existing gullies and reinstatement of carriageway and associated civils works. Further information is contained within the Specification (See Drainage Spec A6) and the Contract Management Suite (See Area 6 Drainage - CECF2021 Contract Management Suite) which contains the Contract Data Part 1, Additional Scope, Site Information, Early Warning Register and CDM Pre-construction stage information.
Related Contracts
From This Buyer
From This Supplier
- SuDS24-02- Washdyke Lane and Woodlands Avenue SuDS
£772,286 ·
- SuDS23-01 - Broadway SuDS
£618,984 ·
- HD010-20 Bargate Church Lane Traffic Signal Improvement and Masonry Repair
£637,000 ·
- Pioneer Business Park Phase 2
£1,000,000 ·
In This Category
- Installation Services, Small Works and Reactive Call Outs
£112,110 ·
- M62 Red Lane Dike Bridge Refurbishment - Ground Investigation
£134,612 ·
- Ebury Phase 2 Marking Suite Fitout Contractor
£500,000 ·
- CA18338 - Chesterfield College Training & Production kitchen ducting, heating and control panel
£79,695 ·
Ref: 3fd562c4-5331-4956-8c1f-41197c105ef4-875635 · Sourced from Contracts Finder