605377 - M5 J29-31 BD FHS
£22,195
Contract Details
- Tender Value
- £9,500
- Stage
- Awarded
- Published
- Awarded
Timeline
Description
"CCTV survey along the edge of the carriageway in the verge and central reservation between MP 260/4 and MP 261/7. Both Directions as shown on drawings in Section 2.1.2 Essential vegetation clearance as required to access and survey the drainage assets. Primarily a swath cut in areas indicated on drawings in Section 2.1.2 High pressure water jetting and root cutting techniques to be undertaken as required to eliminate blockages due to roots, lateral intrusions, debris etc and to facilitate full survey of the drainage assets Due to the works being undertaken in a known dormice area all vegetation clearance, including roots and stalks from the areas identified, shall be carried out under ecological supervision as provided by the Employer. Unnecessary disturbance of verge, ditches and other assets shall be avoided during the works All reports and associated documentation to be handed to Client within 2 weeks of completion of works on site"
Related Contracts
From This Buyer
- Nursery Supplies
£2,700,000 ·
- National Highways Fresnel Lens Distribution 2022
£30,000 ·
- Contract Awarded for Motorway Service Area Energy Storage Systems
£6,561,414 ·
- Pavement Delivery Framework
£1,300,000,000 ·
From This Supplier
Ref: 0d2aede8-45db-4b1e-808b-e2a1ad4500d6-399233 · Sourced from Contracts Finder
View source notice