ContractPulse
Awarded

CHC/663 IHOP, Ramp Edge Protector and Fender

£114,300

works

Contract Details

Tender Value
£114,300
Stage
Awarded
Published
Awarded

Timeline

Awarded
Disclosed
Start
End

Description

The MoD customer has requested the installation and clearance of several additional capabilities onto the RAF Chinook HC Mk5 (Lot 4) platform to ensure equivalence with the Mk6 (Lot 5), thus enabling greater fleet flexibility and resilience for the UK Chinook fleet. This will be achieved by: Embodiment of Troop Insertion and Extraction System Equipment (TIESE) Embodiment of the Interim Hoist Operator Panel (IHOP) to address a human-machine interface (MHI) weakness exposed in the utility of the Winch Operator Grip (WOG) The above capabilities will be delivered by 3x modifications: MOD 0605 Interim Hoist Operator Panel (IHOP) MOD 0607 Ramp Edge Protector MOD 0608 ERH Fender

Related Contracts

Ref: 05cf50cf-8ce2-4e41-81fc-b2cfadfe0819-836470 · Sourced from Contracts Finder

View source notice