# Installation of Door Entry &amp; Access Control System at Gurney House, Hayes

> Tender notice from UK public-sector procurement sources.

## Key facts

- Public buyer: [London Borough of Hillingdon](/buyers/london-borough-of-hillingdon/contract-awards)
- Tender value: £60,000
- Published: 20 May 2019
- Planned start: 5 August 2019
- Planned end: 16 September 2019
- Stage: open_tender
- Procurement category: works
- Notice ID: 00dd82af-7b81-4347-be48-82d5366ea4fa-290463
- OCID: ocds-b5fd17-c3e6f22e-ae73-484b-a424-e76c925d768b

## Description

The London Borough of Hillingdon \(LBH\) intends to install the door entry/access control System at 1-27 Gurney House, Croyde Avenue, Hayes Middx UB3 4EW\. Gurney House is a general needs housing block, comprising of 27 dwellings spread across two blocks each with three floors, i\.e\. ground, first and Second floors\. The Door Entry and Access Control System works at Gurney House broadly comprises of installing new audio door entry and access control systems to the blocks;\. The installation includes the fitting of audio handsets in the flats\. The works include, but not limited to the design, supply, installation, commissioning and hand-over of complete audio door entry systems to each block, integrated and operating with the front main and rear entrance doors and the provision of O&amp;M Manuals and training to the Council's representative in charge of the block\. This tender document consists of two \(2\) parts as shown in the contents table\. PART ONE contains the requirements for the project and provides further instructions and information to the Tenderer to enable them to submit a complete tender\. The Pricing Schedule which forms PART TWO of the tender documents is a schedule of works or the Bill of Quantities to enable the Tenderer to price for the whole project\. The Contractor is expected to provide his rates for the entire Schedule of Works \(SOW\) listed even if the work is to be performed by a sub-Contractor or specialist Contractor\. It is the Tenderer's responsibility to obtain the required rates from specialist sub-Contractors to complete the pricing schedule\. Contract duration 6 weeks lead in time and 6 weeks on site\. Access for site surveys to be 5/6/19 10am

## Related contract awards

- [Provision of Hillingdon's Growth Plan and StrategicAsset Review](/contracts/ocds-b5fd17-b7b3c4d5-22d5-476a-b4ba-69eacccfefba): London Borough of Hillingdon
- [LB Hillingdon - Hayes Public Realm Project](/contracts/ocds-b5fd17-59856744-4b5d-41e3-8e19-1f754f7a174c): London Borough of Hillingdon
- [Further Competition - Architecture \+ Urbanism Framework \(GLA/ TFL reference: GLA81689\) Hayes Town Centre Canalside Redevelopment Design Brief](/contracts/ocds-b5fd17-5386586c-8e37-41bf-b002-ce0ad7257d99): London Borough of Hillingdon

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/00dd82af-7b81-4347-be48-82d5366ea4fa-290463)