Ynysarwed Mine Water Treatment Scheme upgrade to High Density Sludge Treatment Plant Design and Build
£4,688,222
Contract Details
- Tender Value
- £4,688,222
- Stage
- Awarded
- Published
- Awarded
Timeline
Description
Specialist contractor to undertake the design, construction and commissioning of a new high-density sludge treatment plant and decommissioning of the existing treatment plant. • The project objectives; • Replace the existing Treatment Plant with a High Density Sludge (HDS) plant; • Improve the scheme from an operational, environmental and health and safety perspective; • Improve the longevity and resilience of the scheme; • Provide efficiencies with improved chemical dosing and other controls; • Reduce operational costs; • Assess, record and reduce the carbon emissions associated with the life of the scheme; • Identify cost efficiencies; • Reduce risk of pollution of the River Neath and the Neath Canal; • Comply with the existing discharge consents; • Minimise the downtime of the existing scheme during construction; • Develop plans for the assessment, measurement, and continual improvement of waste management, sustainability and carbon impact for the construction, operation and decommissioning of the scheme.
Related Contracts
From This Buyer
From This Supplier
In This Category
- Provide the Fit Out of 1st Floor of Waterdale, Doncaster DN1 3BU
- Fencing in Public Park and Open Spaces within Taunton
£57,000 ·
- Estates Capital Project- LittleBrook Anti-Ligature Doors and Associated Hardware
£35,371 ·
- Consultancy re. Replacement of Roof and Solar Panels at Cranleigh Health Centre
£98,415 ·
Ref: fbecf53a-c6fe-42a4-b0fa-538238f7edc7-498133 · Sourced from Contracts Finder
View source notice