PSF4 Lot 2A- Mill (Threlkeld) Bridge Deck Replacement Design
£26,718
Contract Details
- Tender Value
- £20,000
- Stage
- Awarded
- Published
- Awarded
Timeline
Description
The aim of the project is for the consultant to design a new reinforced concrete deck and associated surfacing to replace the existing timber deck. The load carrying capacity of the new deck should be as great as possible given the capacity of the existing UBs, with a desirable capacity of achieving C&U 40t loading. The running width of the new deck is to remain the same as is current. The existing parapets are to be reused if possible. Proposals are to be supported with structural calculations. Construction methodologies including requirements for any access, vehicle and pedestrian bypasses, temporary works and installation should be proposed in consultation with experienced contractors.
Related Contracts
From This Buyer
- Barrow Multi-Modal Transport Study
£134,900 ·
- CWF Lot 2B - Broadhead Bridge (Replacement Structure)
£194,563 ·
- Lot 1b - Up to 8 Passenger Seats with Passenger Assistant for various areas closing 23 February 2026 (F43)
£0 ·
- Lot 1a - Up to 8 passenger seats for various areas closing 23 February 2026 (F43)
£88,357 ·
From This Supplier
- Lot 2A- Keisley Bridge Widening
£49,897 ·
- P-0710 Highways Technician Consultant
£83,266 ·
- P-0709 Highways Principal Consultant
£102,482 ·
- Programme Business Case Development Support
£119,448 ·
In This Category
Ref: 06be54f4-eaf0-4521-8f67-4b5dae779cf3-892127 · Sourced from Contracts Finder
View source notice