# Supply of Labour and Equipment for Construction of Robust Kerbs - Via Slipform Method

> Tender notice from UK public-sector procurement sources.

## Key facts

- Public buyer: [Eiffage Kier JV HS2 Main Civils Works, Lots C2 &amp; C3](/buyers/eiffage-kier-jv-hs2-main-civils-works-lots-c2-c3/contract-awards)
- Tender value: £1
- Published: 27 January 2021
- Planned start: 30 April 2021
- Planned end: 30 September 2024
- Stage: open_tender
- Procurement category: works
- Notice ID: 01cdd2d0-2a69-4f3d-b99d-e0146b20f640-408109
- OCID: ocds-b5fd17-ccea40ef-0fa6-4b24-808a-f70f02a628ee

## Description

EKFB is seeking to appoint a subcontractor for the supply of labour and equipment for the construction of Robust Kerbs via slipform methods within a precast cut and cover tunnel environment\. The Robust Kerbs consist in densely reinforced concrete walls that run along the tunnels at both sides of the tracks, and will be heavily reinforced by a steel cage which will be supplied and installed by others\. The sub-contractor will be required to construct the Robust Kerbs and to supply the corresponding resources to do so, including labour, plant and equipment and some materials \(such as ducts and pipes\)\. It is important to mention that the reinforcement will be supplied and installed by others and that the concrete will be supplied by EKFB from on- site batching plants, but it will be transported to the subcontract works location by the sub-contractor\. There are 3 No twin-bore Tunnels, each one accommodating 4 No of the Robust Kerbs\. The total overall length of the tunnels is 6km, hence there are 24km of Robust Kerbs to slipform\. The height of the Robust Kerbs is 1535mm\. Anticipated Programme Greatworth - From Jan 23 \(in stages\) Chipping Warden - From Jan 23 \(in stages\) Wendover - Jan 24 Through this expression of interest you will be vetted in accordance with the EKFB prequalification model - for further information visit https://www\.competefor\.com/EiffageKier/ Following receipt of the questionnaire, we will create a short list by assessing capabilities, experience and availability of each supplier\. Upon successful shortlisting you will be invited to tender from the EKFB e-Sourcing platform Market Dojo, EKFB will be using a balanced scorecard approach to its procurement activities - for further information visit the above website\. Kerry Albrighton - Senior Buyer Please see attached Sketch and Supporting Documents Additional information: Please see attached Sketch and Supporting Documents

## Related contract awards

- [EKFB JV - G2S - Green Tunnel Laser Screeding](/contracts/ocds-b5fd17-9450ea23-d3b6-4d5d-aba2-74abc6ea2c4e): Eiffage Kier JV HS2 Main Civils Works, Lots C2 &amp; C3
- [EKFB JV - Temporary Works Design - For Gas Main Protection Slabs \(must be Lloyds registered approved\)](/contracts/ocds-b5fd17-ba40e027-9771-4187-bd6f-452c7c27b96b): Eiffage Kier JV HS2 Main Civils Works, Lots C2 &amp; C3
- [EKFB - Greatworth to Southam- Highway Vehicle Restraint System](/contracts/ocds-b5fd17-d2a7c0bf-278f-40ae-b836-eaf89721f299): Eiffage Kier JV HS2 Main Civils Works, Lots C2 &amp; C3

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/01cdd2d0-2a69-4f3d-b99d-e0146b20f640-408109)