# Quotation for New Accessible Platform Lift at West Bromwich Central Library - AWARD

> Contract award record from UK public-sector procurement sources.

## Key facts

- Public buyer: [Sandwell Metropolitan Borough Council](/buyers/sandwell-metropolitan-borough-council/contract-awards)
- Contract winner: Sutton Coldfield Construction Ltd
- Award value: £0
- Award date: 21 May 2018
- Published: 22 May 2018
- Contract start: 2 April 2018
- Contract end: 15 June 2018
- Stage: awarded
- Procurement category: works
- Notice ID: 0ec27a1b-ccdd-4207-a045-5c0b700e1a66-217574
- OCID: ocds-b5fd17-cd2303e8-d290-435e-bf75-98ea91d1d458

## Description

Quotation for New Accessible Platform Lift at West Bromwich Central Library This Invitation to Quote has been produced to enable Sandwell Metropolitan Borough Council \('the Authority'\) to appoint a company \('the Company'\) with the required economic and financial standing for the proposed access lift works at West Bromwich Central Library\. Scope of Contract for which this Invitation to Quote Applies The Contract will involve the proposed new accessible lift and will include as a minimum the following works: - Building demolition works - Partitioning - New doors - Emergency lighting and controls - Relocation of existing decorative staircase decorations - Invalifts quote ref SHEI 997 SL9236 All as detailed on drawing No Il '603-UD-00-GF-A-\(0-\)-001-PROPOSED SCHEME The approximate financial value of the works will be E40,000 and the approximate contract period will be 10 weeks\. The Council will be using the In-tend e-Tendering System for this Procurement exercise, please visit https://in-tendhost\.co\.uk/sandwellmbc to access the Sandwell MBC In-tend Supplier Portal\. From here you will be able to register your company, express an interest in the opportunity, and gain immediate access to the Quotation document or other related documents\. In Order To View a On-Line Questionnaire \(if applicable\) or Submit a Quotation, you will be required to\` Opt-In\`\. Please be mindful that if you are cut and pasting your question responses onto the On-Line Questionnaire that you do so from a notepad document, this is due to the fact that some special characters are not accepted within the On-Line Questionnaire\. For a Step by Step user guide to the Sandwell MBC In-tend Supplier Portal please click on the \`Guidance for Suppliers\` section of the website\. All procurement responses must be carried out via the Sandwell MBC In-tend Supplier Portal\. If you require further assistance in respect of the system please contact the In-tend support team on 0844 272 8810\. Closing date: Monday 12 March 2018 at 15:00hrs

## Related contract awards

- [Refurbishment of Existing KS2 toilets and New Resource Room, Temple Meadow School, - AWARD](/contracts/ocds-b5fd17-58e0038e-ec39-41e4-bb76-f9c0e757034f): Sandwell Metropolitan Borough Council
- [Media Workshop - AWARD](/contracts/ocds-b5fd17-799a0b55-a042-4e77-9fcc-a33d7ade82af): Sandwell Metropolitan Borough Council
- [Starting your Tax Journey 2026 - AWARD](/contracts/ocds-b5fd17-7cbcb1a4-ef38-4324-bd5b-93acbd0aec85): Sandwell Metropolitan Borough Council
- [Bournbrook Residences &amp; Sports Pavilion - Contractor](/contracts/ocds-b5fd17-55df6aff-4025-4350-a1fc-10abf5b1ab8b): THE UNIVERSITY OF BIRMINGHAM
- [Tiverton Road Baths Refurbishment](/contracts/ocds-b5fd17-688478ed-b500-47b7-8dff-78179f9f2a52): THE UNIVERSITY OF BIRMINGHAM
- [Chemical Engineering Building - 2nd Floor WC Refurb](/contracts/ocds-b5fd17-edae9b74-9118-4bfe-87aa-4feec008e6be): THE UNIVERSITY OF BIRMINGHAM

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/0ec27a1b-ccdd-4207-a045-5c0b700e1a66-217574)
