Structural Steelwork to new Link Bridge, Canopy and Lift Shaft Enclosure
Contract Details
- Tender Value
- £2,500,000
- Stage
- Open Tender
- Published
Timeline
Description
Mace Dragados require a steelwork subcontractor to carry out the design (to Stage 5) supply, fabrication, installation and erection of the following 1. A 13200mm long 2100mm wide link bridge connecting the Maria Fidelis Old School Building and the Maria Fidelis Building Accommodation first floors. Includes steel structure, concrete foundations and cladding. 2. Steel frame structure, concrete foundations and external cladding for a 8 person lift shaft on the Maria Old School Building providing access to ground level, bridge level, first floor, second floor and roof. Lift to be installed by Others. 3. A 10m x 4m steel canopy at the entrance of the Maria Fidelis Old School Building. See attached drawings
Related Contracts
From This Buyer
From This Supplier
- Expression of Interest: Refurbishment and upgrade of Community Hub roof, refurbishment of 2No. toilet blocks and construction of new toilet facilities
- Apprenticeships Training Dynamic Marketplace
- Taxi and MPV (1-8 seats) Passenger Assistant - Taxi and MPV (1-8 seats) Passenger Assistant
- Taxi and MPV (1-8 seats) Passenger Assistant - Taxi and MPV (1-8 seats) Passenger Assistant
In This Category
- PAHT - ITU Dirty Utility Refurbishment
£52,000 ·
- HD029-25 Peterhouse Road Grimsby
£204,455 ·
- DNWP0019/LOT1B/ WAGR / PIE ILW - Detailed Design
£2,468,738 ·
- PRP318 Glenholme - Refurbishment Works
£1,125,847 ·
Ref: 883d2c15-2c39-43d1-a129-f452ef686b0b-860114 · Sourced from Contracts Finder
View source notice