# Dover -Control Panel Upgrade

> Contract award record from UK public-sector procurement sources.

## Key facts

- Public buyer: [MCA - Maritime and Coastguard Agency](/buyers/mca-maritime-and-coastguard-agency/contract-awards)
- Contract winner: Building ManagementSolutions Integrators Ltd
- Award value: £25,543
- Tender value: £25,543
- Award date: 26 July 2021
- Published: 16 September 2021
- Contract start: 26 July 2021
- Contract end: 2 August 2021
- Stage: awarded
- Procurement category: services
- Notice ID: 0c8540c8-f6d8-49af-a8f6-6b04487aebb2-469136
- OCID: ocds-b5fd17-d4e0f6a6-f1e2-4a02-a46e-03aed8891dbc

## Description

The Control Panel scope of work which we propose to undertake is as follows:1\. Design, manufacture and delivery of 1x form 2 BMS Control Panel\. 2\. Fitting and wiring of free issue Controller, displays, modules and network equipment\. We have allowed to upgrade the existing Trend obsolete IQ2 Series control with the latest Trend IQ4e controllers\. 3\. To supply and install a new Trend IQView4 display panel so that settings can be changed locally from the front of the new control panel\. 4\. Factory Inspection &amp; Testing of control panels\. 5\. Documentation &amp; certification package\. Panel changeover scope of work which we propose to undertake is as follows:1\. Isolate, test and make-safe to MCC and control enclosure\. 2\. Disconnect existing cabling from both, retain the MCC gland plate if any cables cannot be re-glanded\. 3\. Mount new combined Form 2 MCC/Control enclosure in position vacated by the old MCC\. 4\. Allowance for new panel is 20x drives/feeds &amp; 41x points \(based on the supplied panel drawings and load list\) 5\. Divert existing control cabling to new panel \(some cabling may need a small JB, included\)\. 6\. Re terminate all\. 7\. Existing field cablingassumed suitable for re-use\. 8\. Existing sensors and control devices to be retained\. 9\. Existing feed to be reused, assumed as sufficient capacity\. 10\. Dispose of old panels via a registered waste contractor\. 11\. Issue minor works cert\. BMS Commissioning1\. To create energy efficient software associated with the existing mechanical plant\. 2\. Point to Point check of the existing controls cables\. 3\. Download the new software into the new controller\. 4\. Re commission of the BMS controls\. 5\. Set up IQView4 on panel\. 6\. To commission, handover and provide documentation relating to the completed installation\.

## Related contract awards

- [Repairs and Fit Out of Cleethorpes Coastguard Rescue Station \(CRS\)](/contracts/ocds-b5fd17-e51258e3-0a14-49ae-a1e1-335b09b3ef68): MCA - Maritime and Coastguard Agency
- [MARITIME &amp; COASTGUARD AGENCY \(MCA\) - HIGHLANDS &amp; ISLANDS MODULAR CRS FACILITIES UPGRADE PROJECT](/contracts/ocds-b5fd17-54c7c7bf-ca13-4d06-8a30-8c19ae4a63ad): MCA - Maritime and Coastguard Agency
- [Facilities Manager](/contracts/ocds-b5fd17-3468d302-4ee1-4c00-9dd0-b9f19301df72): MCA - Maritime and Coastguard Agency

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/0c8540c8-f6d8-49af-a8f6-6b04487aebb2-469136)