# Bournemouth Beach Management Groyne Building Programme 2017-2019

> A sourced UK public sector contract award published by The Council of the Borough of Bournemouth.

## Key facts

- Buyer: The Council of the Borough of Bournemouth
- Supplier: [Suttle Projects Ltd](/suppliers/suttle-projects/public-sector-contract-awards)
- Award value: £2,282,069
- Tender value: £4,500,000
- Award date: 10 October 2017
- Published: 13 October 2017
- Contract start: 6 November 2017
- Contract end: 29 April 2019
- Stage: awarded
- Procurement category: works
- Notice ID: 0abaeca4-8ed6-4bc6-baee-88107143030c-176137
- OCID: ocds-b5fd17-d4f9e9e8-75cf-4b17-b8f0-c14dbd79bea7

## Description

Bournemouth Borough Council is seeking to appoint a contractor to construct an employer designed scheme comprising of the construction 12 \(twelve\) new timber groynes and the deconstruction of 12 \(twelve\) existing timber groynes\. The construction works are part of a long-term project to renew coastal defences at the Bournemouth seafront and will provide ongoing coastal protection of assets and property from coastal erosion and damage\. Due to the exposed nature of the site, the Contractor must ensure that sufficient resources are available to him at all times in order that he can complete the Works by the completion date using safe and reliable methods, experienced resources and effective management procedures The construction sequencing is given below\. Phase 1 \(16th October 2017 to 29th April 2018\) - Works to commence no sooner than 16th October 2017 with sectional completion date of 29th April 2018 to construct 6 \(six\) new groynes \(C51, C52, C53, C54, C55 &amp; C56\)and to deconstruct 6 \(six\) existing groynes numbered \(B45, B46, B47, B48, B49 &amp; B50\) as shown on drawing number BBM-GRP-07, timber to be supplied by Bournemouth Borough Council Phase 2a \(1st October 2018 to 24th February 2019\) - Works to commence no sooner than 1st October2018 with completion date of 24th February 2019 to construct 3 \(three\) new groynes \(C48, C49 &amp; C50\) and deconstruct 3 \(three\) existing groynes \(B42, B43 &amp; B44\), timber to be supplied by Bournemouth Borough Council Phase 2b \(1st October 2018 to 28th April 2019\) - Works to commence no sooner than 1st October 2018 with completion date of 28th April 2019 to construct 3 \(three\) new groynes \(C45, C46 &amp; C47\) and deconstruct 3\(three\) existing groynes \(B39, B40 &amp; B41\)\., timber to be supplied by Bournemouth Borough Council The contract commences on Monday 16 October 2017 and works are to be completed by Sunday 28 April 2019\. A notice was sent to the European Journal regarding this opportunity on 28/06/2017\. Additional information: Suppliers interested in this contract opportunity can access the full procurement documentation by visiting Bournemouth Borough Council's electronic Tendering system www\.supplyingthesouthwest\.org\.uk Suppliers should search for the contract opportunity through Supplying the South West\. There are further details of the contract opportunity on the advert published on www\.supplyingthesouthwest\.org\.uk and instructions on how suppliers can access the procurement documentation for completion\. Responses to the contract opportunity must be submitted electronically through www\.supplyingthesouthwest\.org\.uk before the deadline shown on the system\. If you are unable to access the advert for the opportunity through www\.supplyingthesouthwest\.org\.uk please contact the Council using the contact details provided\.

## Related contract awards

- [Design and Construction of a Modular Building to provide a Two Classroom Resource Base at Kingsleigh Primary School](/contracts/ocds-b5fd17-a32a4840-bb16-4ee6-b01e-a59a8d86db0f) — The Council of the Borough of Bournemouth
- [Supply of Timber for Groyne Replacement Programme 2018/19](/contracts/ocds-b5fd17-80e5f7a3-fdaf-4a43-a6e3-c0988e763684) — The Council of the Borough of Bournemouth
- [Construction of Beach Lodges for Manor Steps Phase Two](/contracts/ocds-b5fd17-ff2e5535-6641-47ed-9aa2-a9f623cc45c9) — The Council of the Borough of Bournemouth
- [Architect and Principal Designer Services for the Proposed Development at 129-139 Princess Road and 8-14 Prince of Wales Road](/contracts/ocds-b5fd17-82d515b3-ae28-46f5-b7f7-7857dd3f3718) — The Council of the Borough of Bournemouth
- [UK 6 notice](/contracts/ocds-b5fd17-e357d707-a95e-44a9-8422-af616d610fa3) — Bristol City Council
- [Maintenance Work On Sterte Channel](/contracts/ocds-b5fd17-209bb278-7a61-45eb-9724-0b12217d17d7) — Bournemouth Christchurch and Poole Council
- [Hamworthy Park Seawall \(East\) Repairs](/contracts/ocds-b5fd17-626929e4-3510-48b0-8cef-aa16ee555795) — Bournemouth Christchurch and Poole Council
- [Royal Victoria Country Park - Sea Defence Wall - AWARD](/contracts/ocds-b5fd17-5dd29a01-71a3-4c92-b85c-1c2773680f08) — Hampshire County Council
- [CBC-2087-Q-SM Wet Floor Shower Delivery - AWARD](/contracts/ocds-b5fd17-11701a99-cc98-4a95-a10c-7337ce695040) — Central Bedfordshire Council
- [Core Hole Drilling](/contracts/ocds-b5fd17-2b364901-2072-41f9-945d-9c0134895560) — Kirklees Council
- [Cyclical Decoration Works Contract](/contracts/ocds-b5fd17-24f8a6a4-41c3-40bd-b1fc-a8691da66aae) — Housing Solutions
- [Surface Works throughout Taunton](/contracts/ocds-b5fd17-02865998-cbdb-4740-967a-375a9ebc0365) — Taunton Town Council

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/0abaeca4-8ed6-4bc6-baee-88107143030c-176137)