# The Pioneer Academy, Stewart Fleming Primary School: Phase 2

> Tender notice from UK public-sector procurement sources.

## Key facts

- Public buyer: [London Borough of Bromley](/buyers/london-borough-of-bromley/contract-awards)
- Published: 16 October 2017
- Planned start: 2 April 2018
- Planned end: 24 August 2018
- Stage: open_tender
- Procurement category: works
- Notice ID: 9ac725fd-63a1-4b15-8e2c-dace57768e30-176469
- OCID: ocds-b5fd17-d5f63829-2c0d-41ea-aad6-3ebf0a0d8d22

## Description

The proposed works comprise partial demolition of the existing school building and construction of a single and double storey extension with roof level external play areas, hard and soft landscaping, localised alterations and refurbishment of the existing building and site and all associated M&amp;E, drainage and temporary works at The Pioneer Academy, Stewart Fleming Primary School\. The Works form Phase 2 of a two phase project\. The tender opportunity will be run electronically through the London Tenders Portal and providers will need to register their company with the portal as soon as possible \(if they have not already done so\) at www\.londontenders\.org to ensure they are able to access and submit the relevant documents online\. All applications MUST be made through the London Tenders Portal ONLY and NOT to the Contact Details contained within this notice\.

## Related contract awards

- [New Liquid Roof and Associated Works](/contracts/ocds-b5fd17-abd1265c-8145-4385-a8f1-116b3dae64b4): London Borough of Bromley
- [Training to Support NHS Health Checks in Bromley](/contracts/ocds-b5fd17-01cffacd-c433-41ee-8c08-88bd3403f08e): London Borough of Bromley
- [Kelsey Lakes Desilting Project](/contracts/ocds-b5fd17-71905c48-b80f-41f0-aa84-ec7f6b09d28f): London Borough of Bromley

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/9ac725fd-63a1-4b15-8e2c-dace57768e30-176469)
