ContractPulse
Awarded

Area 4 Buttercrambe, Stamford & Helperthorpe R&R Package

£296,832

works

Contract Details

Tender Value
£382,000
Stage
Awarded
Published
Awarded

Timeline

Awarded
Disclosed
Start
End

Description

Buttercrambe: Works under 8-hour daytime road closure. Single track lane with limited passing places or turning areas. Isolated lengths of kerbing/channelling to delineate and provide support to edge of carriageway. Provision of concrete lined drainage grips. Some carriageway reconstruction/widening works with excavation up to 350mm deep. Mainly overlay of existing carriageway with depths varying 60mm, 100mm to 160mm. Stamford: Works under 8-hour daytime road closure but would prefer 3-way traffic signals if geometry allows. 50m length of kerbing/channelling with 50m x 1m x 40mm deep patch reinstatement to front to arrest overrun damage. Working time restriction 0930 to 1630 to avoid peak traffic flow. Helperthorpe: Works under 8-hour daytime road closure. Single track lane with limited passing places or turning areas. Isolated lengths of kerbing/channelling to delineate and provide support to edge of carriageway. Mainly overlay of existing carriageway with depths varying 60mm, 100mm to 200mm. Short length of 200mm deep inlay.

Related Contracts

Ref: 836c0f65-9d28-4f7c-ad82-e654879ef64c-376144 · Sourced from Contracts Finder

View source notice