Safe and Warm Upgrade Scheme Park View Barlborough - AWARD
£151,133
Contract Details
- Stage
- Awarded
- Published
- Awarded
Timeline
Description
Bolsover District Council wishes to appoint a principal contractor on the basis of a minor works JCT contract for the undertaking of Safe & Warm upgrade works at the 19 Nr. bungalows and one communal area in Barlborough. The main scope of this scheme is to provide central heating upgrading, wet room conversion and improved fire safety measures within each of the bungalows. The communal area is only having the heating upgrade works. Currently, heating and hot water is supplied to each bungalow on a communal system provided from a central boiler house, located on the site. Due to the age and general condition of the boiler it is proposed for each bungalow to have its own independently controlled heating system installed in the form of a gas combi-boiler. The appointed contractor will be charged with the isolation and capping-off of the existing heating system at each bungalow within the programme of works. Please note that the de-commissioning of the boiler house will not form part of this project and is to be undertaken by the authority's facilities management contractor. Existing shower areas are to be altered and a full wetroom conversion is to be undertaken to standard designs across all bungalows. This will involve the installation of a new shower, wash hand basin and w/c complete to improve and standardise the facility for all bungalows. To improve the fire safety aspects of the dwelling the installation of a new multi-sensor alarm system is to be installed and fire-stopping implemented throughout as per the requested fire compartmentation survey which the appointed contractor is to arrange and oversee as part of the project. It is estimated that a start on site is achievable during August 2019 and that completion of the scheme should be achieved within a 12 week programme. The tenant needs and requirements are paramount to the successful completion of this project. The successful contractor will be expected to show flexibility, excellence in tenant support / liaison and work in partnership with the Contract Administrator / Building Surveyor to meet and exceed tenant expectation and levels of satisfaction.
Related Contracts
From This Buyer
From This Supplier
- Boiler Installation (Planned Replacements And Ad-Hoc) (via Minor Construction Works and Maintenance Purchasing System DPS - Lot 4 - Heating and Hot Water Systems & Associated Plant (install &/or maintenance)
£752,653 ·
- Lot 4 - Design, Supply and Installation of Replacement Heating and Domestic Hot Water Provision to Individual Flats and Communal Areas at Aspley Court, Sutton-in-Ashfield
£333,488 ·
- Lot 26 - Aids and Adaptions To various Council owned Properties throughout the District of Ashfield
£640,000 ·
- NUN - Repairs Programme
£350,000 ·
In This Category
- Replacement of DB Boards (SWQ3135,SWQ3136,SWQ3144,SWQ3164)
£155,478 ·
- PDF Framework - OD-NW-PRI-Pavement & Roadmarking AD10 PCI Pack 1 26-27 (Galliford Try PC for Holcim Programme)
£1,869,061 ·
- Refurbishment of the Voluntary and Community Sector property at Homerton Friends Lodge
£41,706 ·
- PDF Framework - A1M J56 Barton Resurfacing scheme
£97,402 ·
Ref: 6938b2b1-b2de-456c-8a70-744eed15c251-340462 · Sourced from Contracts Finder