# HEATING SYSTEM UPGRADES

> A sourced UK public sector contract award published by Braintree District Council.

## Key facts

- Buyer: [Braintree District Council](/buyers/braintree-district-council/contract-awards)
- Supplier: Property 360 Ltd
- Award value: £658,422
- Tender value: £658,422
- Award date: 4 August 2026
- Published: 13 August 2026
- Contract start: 4 August 2026
- Contract end: 1 December 2026
- Stage: awarded
- Procurement category: works
- Notice ID: 6d52712e-4abf-497d-9bcb-26d2bd04d04f-910574
- OCID: ocds-b5fd17-d9addc5a-b96f-405d-a142-6f9c257941ce

## Description

The purpose of this requirement is to upgrade the heating system at Marks Farm Community Centre and Silver End Village Hall, as well as the supply and installation of a new Photovoltaic Array on the roof of Silver End Village Hall\. Silver End Village Hall is a large community centre in Silver End\. Its main use is to provide a community facility for local residents\. It has a changing room to the rear managed by Braintree District Council and current tenant's, include a Social Club, Silver End Parish Council offices, ECC Family Hub and small to medium sized events business, who hire out their space to a nursery, a library and for events\. Marks Farm Community Centre is a medium sized community centre in Braintree\. Its main use is to provide community facilities for local residents\. It has a changing room to the rear managed by Braintree District Council and its current tenant is a small to medium sized events business, who hire out their space to a nursery and also for events\. The existing heating systems in both buildings have reached the end of their serviceable life and are now life expired, resulting in increasing maintenance needs and risk of failure\. The refurbishment will replace outdated components, improve accessibility, renew mechanical and electrical systems, and ensure compliance with current building, health and safety and landlord obligations\. The works will also support ongoing lettability of the building's and contribute to maintaining statutory standards such as minimum energy efficiency requirements\.

## Related contract awards

- [Enterprise Centre Refurbishment Works](/contracts/ocds-b5fd17-3ec97d7b-dbf6-4012-9fc4-fbef611ca81c) — Braintree District Council
- [Delivery of Refurbishment Works at Multiple Sites](/contracts/ocds-b5fd17-c6fd6e0b-b691-4387-89b6-4c63bab9302b) — Braintree District Council
- [CCTV installation](/contracts/ocds-b5fd17-47ffefc2-f30e-42ef-ad1b-1aabfdffa2cc) — Braintree District Council
- [Transformation](/contracts/ocds-b5fd17-09aaaf60-527c-4a52-9a90-cdba6da1c9a9) — Braintree District Council
- [GB-Colchester: Lighting replacement of existing gallery and cinema and external repairs](/contracts/ocds-b5fd17-37648f36-b75c-4903-a1db-4542ec4fb1b8) — Firstsite
- [Boxted Hub and Pavilion refurbishment](/contracts/ocds-b5fd17-3471d738-59b1-4c28-ba7e-14668a42ec52) — Boxted Sports &amp; Social Club
- [WQP M1 Top Lock Cottage - Ground Investigation Works](/contracts/ocds-b5fd17-0c6645ae-1ffd-450c-a57d-c1cece2b8562) — National Highways Limited
- [Sir Francis Way Demolition](/contracts/ocds-b5fd17-e845682d-85fa-4b5d-809e-3893e4c4acd0) — Brentwood Borough Council
- [Painting &amp; Surface Coating Works - Ref: JGC/2026/01](/contracts/ocds-b5fd17-84a02b74-ed42-4c06-8d3a-b08303436c18) — Jomi Growth Consulting
- [EPP0145 - Asbestos Removal](/contracts/ocds-b5fd17-2272a179-7b8b-4af8-b0c1-e70f1453cf01) — Tendring District Council

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/6d52712e-4abf-497d-9bcb-26d2bd04d04f-910574)
