ContractPulse
Live

THG Whole House Works Lovell Partnerships Limited

£9,000,000

Together Housing AssociationLovell Partnerships Limited
works

Contract Details

Tender Value
£0
Stage
Live
Published
Awarded

Timeline

Awarded
Start
Disclosed
End

Description

This notice relates to a modification to https://www.contractsfinder.service.gov.uk/Notice/3ce6eae4-bde2-410a-af02-2ddc0363f93d The Contracting Authority intends to modify the above referenced Contract to increase the maximum Contract value to ensure continued delivery of essential planned works during the remaining Contract Term. The need for this modification has arisen due to unforeseen circumstances affecting programme delivery, specifically: • the non performance of another contractor; and • the insolvency and subsequent termination of a further contractor, both of which have resulted in a significantly higher volume of works being required from the remaining Contractors than originally anticipated at the point of award. To maintain service continuity across the housing portfolio, the Authority must redistribute these essential works to the remaining Contractors. This modification increases the maximum Contract value by up to £3,000,000, resulting in a revised potential maximum value of £9,000,000. The uplift enables the Authority to deliver works that cannot be deferred without creating risks to asset condition, resident safety, and statutory compliance obligations. This modification is made in accordance with Regulation 72(1)(c) of the Public Contracts Regulations 2015. The need for the modification has arisen due to circumstances which a diligent contracting authority could not have foreseen. The modification does not alter the overall nature of the Contract, and the increase in value remains within the permissible 50% threshold under the Regulation. In parallel, the Authority is progressing an appropriate route to market to re establish capacity within the programme. The additional £3,000,000 represents a maximum contingency allowance to safeguard continuity of essential works during this interim period. It is not anticipated that the full uplift will necessarily be utilised; however, it provides the flexibility required to respond to further programme pressures while longer term procurement solutions are implemented. There is no change to the Contract duration, which will continue to end on 22 October 2026, and all other contractual provisions remain unchanged.

Related Contracts

Ref: 08849b87-bb0d-4d44-a617-136864b30994-889445 · Sourced from Contracts Finder

View source notice