# A417 Missing Link - Sheet Piling

> Contract award record from UK public-sector procurement sources.

## Key facts

- Public buyer: [KIER TRANSPORTATION LIMITED](/buyers/kier-transportation-limited/contract-awards)
- Contract winner: Sheet Piling \(UK\) Limited
- Award value: £241,330
- Tender value: £240,000
- Award date: 20 December 2024
- Published: 29 October 2025
- Contract start: 7 January 2025
- Contract end: 24 April 2026
- Stage: awarded
- Procurement category: works
- Notice ID: 356361e2-bda0-454c-8149-a6af145b1ce3-870063
- OCID: ocds-b5fd17-df6b6bc2-7a6b-4a01-bb87-884548e36d73

## Description

Purpose of Notice - The procurement of a Subcontractor for the Sheet Piling works associated with Grove Farm in connection with the A417 Missing Link at Air Balloon\. Scheme Description - Under the National Highways Limited Regional Delivery Partnership \(RDP\), we are appointed as the Principal Contractor for the design and construction of a new dual carriageway at the A417 Missing Link at Air Balloon\. The scheme would provide 3\.4 miles \(5\.5km\) of new, rural all-purpose dual carriageway for the A417\. The new dual carriageway would connect the existing A417 Brockworth bypass with the existing dual carriageway A417 south of Cowley\. Registering Interest - Interested parties are to register their interest through making contact via guy\.hornsey@kier\.co\.uk\.

## Related contract awards

- [A417 Missing Link - Series 1500 Motorway Communications](/contracts/ocds-b5fd17-cf7c6d83-d438-42c1-8c10-653f740053d2): KIER TRANSPORTATION LIMITED
- [A417 Missing Link - Concrete Surface Water Channel &amp; Concrete Safety Barrier](/contracts/ocds-b5fd17-0846583d-9558-436e-9c2b-c87224c67c1f): KIER TRANSPORTATION LIMITED
- [A417 Missing Link - Structures Surface Coatings](/contracts/ocds-b5fd17-57e9789a-fd6b-4d55-ba60-6473747033b8): KIER TRANSPORTATION LIMITED

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/356361e2-bda0-454c-8149-a6af145b1ce3-870063)
