A39 Falmouth Gateway Treluswell Retaining Wall - Concreting
Tender value £30,000
Notice details
- Published
- Category
- works
- Buyer region
- South West
- Source
- View official notice
Public buyer and contract winner
Award value£0
- AwardedCompleted
- StartCompleted
- EndCompleted
Work description
Construction of mass concrete retaining wall with reinforced concrete parapet • Including some backfilling works (e.g. no fines concrete, scope tbc) • Includes access path and steps/handrail at base of wall • Includes dry stone parapet section to tie in with existing dry stone parapet • Subcontractor to design all temporary works required for their works • No subcontract design of the permanent works.
• Compliance with CORMAC's Health and Safety system and ensure the health and safety of your personnel and others whilst at work. All personnel will receive an induction prior to working. • Compliance with our Site Safety Management System procedures which include for production of regular Safety Check List documents, Risk Assessments and Method Statements. • To be committed, in the same way as CORMAC to a fully trained work force which will require personnel supplied by yourselves, to be correspondingly qualified to the appropriate scheme and to carry the relevant card at all times. • Compliance with CORMAC's Environmental management system • Compliance with CORMAC's Quality management system • Compliance with CORMAC's Code of Conduct
The conditions of subcontract are the 3rd Edition (April 2013) of the NEC Engineering and Construction Short Contract as amended in subcontract enquiry.
Re-measured in accordance with BoQ and subcontract conditions of contract. The method of measurement is the Method of Measurement for Highway Works.