WP4777 - Dungeness A Active Drains
£45,308
Contract Details
- Stage
- Awarded
- Published
- Awarded
Timeline
Description
Dungeness A Decommissioning Site (DNA) has a network of drains to allow effluent to flow from source to the Active Effluent Water Treatment Plant (AEWTP). In order to facilitate the demolition of various buildings to allow the retrieval of the site's eight boilers it is necessary to remove some of these drains and infill with grout. Two sections are to have the primary pipe removed and the secondary containment infilled with grout. Characterisation is necessary to underpin decisions for optimised disposal of the primary pipework and continued management of the secondary containment.
Related Contracts
From This Buyer
- Pre-Concept Environmental Safety Case Support
£49,980 ·
- Sellafield Calder Primary Circuit
£1,775,908 ·
- Teutates Technical Study
£166,468 ·
- CSSF-002 - GDF Criticality Safety Methodology and Assessments
£40,000 ·
From This Supplier
- Health Physics 2022-2026 (HP3)
£1,484,893 ·
- WP4728 - Reactor Building De-plant HNA
£44,594 ·
- Non-Active Drains Survey
£301,751 ·
Ref: cdb18f57-a28d-41a7-a8c2-b27b17faa43f-627884 · Sourced from Contracts Finder