# The Supply and Installation of Gas CHP, Gas Boilers and associated equipment for the creation of an Energy Centre at 100 Temple Street

> Tender notice from UK public-sector procurement sources.

## Key facts

- Public buyer: [Bristol City Council](/buyers/bristol-city-council/contract-awards)
- Tender value: £1,600,000
- Published: 11 April 2019
- Planned start: 3 June 2019
- Planned end: 2 June 2022
- Stage: open_tender
- Procurement category: works
- Notice ID: d7e62476-cc7e-46c4-98dc-62ad4d639411-283203
- OCID: ocds-b5fd17-e749cc3d-9074-4892-9633-d9a2e6613889

## Description

The supply, installation and commissioning of the CHP and gas boiler heating plant and associated equipment within the Energy Centre, with integration to existing systems within 100 Temple Street as well as heat export to the local heat network\. The scope of work also includes the electrical connection from the CHP unit to the existing HV system which supplies on site demand and export connection to the local distribution network\.

## Related contract awards

- [Fire Strategy, Fire Strategy Drawings and the Fire &amp; Emergency file\. Eccleston House\.](/contracts/ocds-b5fd17-c5cf1124-ffd9-4539-907f-1565c5e42cb0): Bristol City Council
- [Fire Strategy, Fire Strategy Drawings and the Fire &amp; Emergency file\. Phoenix House\.](/contracts/ocds-b5fd17-9ba83506-86bb-4e88-b7d2-f206e3804eba): Bristol City Council
- [Barton House - Desktop Asset Assessment](/contracts/ocds-b5fd17-7e91fa22-24d4-4327-acfa-c2f0191bfe44): Bristol City Council

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/d7e62476-cc7e-46c4-98dc-62ad4d639411-283203)
