Live
Supply of Temperature Control System - AWARD
£177,896
CPI (Centre for Process Innovation)Daikin Applied Service
goods
Contract Details
- Stage
- Live
- Published
- Awarded
Timeline
Awarded
Start
Disclosed
End
Description
CPI requires a replacement chiller unit on the upper plant deck of The Neville Hamlin Building. The current Chilled water system has a Chilled water tank containing 30% Propyl alcohol and is circulated around the sites plant for cooling capacity. Cooling fluid temperature is set to 7 °C on supply to the plant. CPI have a requirement for the existing two chillers to be repaired, restoring capacity to OEM specification.