UKRI-2960 Building R69 Design and Build
£468,871
Contract Details
- Tender Value
- £468,871
- Stage
- Awarded
- Published
- Awarded
Timeline
Description
This document sets out the Client (UKRI) Brief for the Building to replace HRPD Building R69 for ISIS Neutron and Muon Source based at Rutherford Appleton Laboratory at Didcot, Oxfordshire. The new building will aim to provide ample space for the new instruments, better staff facilities and allow for future adaptability should new instruments or experiments need to be accommodated. The new building is proposed to be a 2-storey building built on the existing footprint. The proposed building contains a main Instrument Hall and supporting facilities such as Control Room, Meeting Room and Laboratory. The project is currently at RIBA Stage 3. https://www.ukri.org/who-we-are/procurement-contract-transparency-data/
Related Contracts
From This Buyer
From This Supplier
In This Category
- PAHT - ITU Dirty Utility Refurbishment
£52,000 ·
- HD029-25 Peterhouse Road Grimsby
£204,455 ·
- DNWP0019/LOT1B/ WAGR / PIE ILW - Detailed Design
£2,468,738 ·
- PRP318 Glenholme - Refurbishment Works
£1,125,847 ·
Ref: 4d1807be-fcbd-473f-8940-1c6ab9c9b692-711012 · Sourced from Contracts Finder
View source notice