Holmer Green First School - Legionella Remedials

£12,000

works

Contract Details

Tender Value
£12,000
Stage
Awarded
Published
Awarded

Timeline

Awarded
Disclosed
Start
End

Description

Carry out the isolation and disconnection of hot and cold water services to 9no. water sink/trough. (Due to there being no access to the existing sensor taps under the pre-built water sink/trough we will Have to disconnect and remove the trough to allow the removal of the new taps.) Carry out the installation of 23 no. Non concussive Taps Re install Sink/trough after new taps are installed, Re seal sink/trough with silicon Carry out the alterations to the pipework and carry out installation of new blended water float to each tap. Remove cabling and dart valley sensor equipment from under each sink/trough Check and test