# Alternative Measurement Methods

> Contract award record from UK public-sector procurement sources.

## Key facts

- Public buyer: [United Kingdom Atomic Energy Authority](/buyers/united-kingdom-atomic-energy-authority/contract-awards)
- Contract winner: Fraser Nash Consultancy
- Award value: £125,000
- Award date: 5 April 2023
- Published: 26 April 2023
- Contract start: 26 April 2023
- Contract end: 31 March 2024
- Stage: awarded
- Procurement category: services
- Notice ID: 1dc51d5a-777e-4272-a46e-793e82306316-639861
- OCID: ocds-b5fd17-f27ded03-6dd0-403a-a29e-a8931ea51b60

## Description

Working with the STEP programme, the Control Systems Integration \(CSI\) work area is looking to support these ambitions by developing its knowledge of the necessary plant control systems and potential requirements of a Fusion Power Plant \(FPP\)\. As part of this, there is significant challenge in providing the necessary sensors for the control and monitoring of the plasma relevant aspects of the power plant\. This specifically relates to the sensors and associated equipment required to operate within the harsh environment in and around the fusion machine \(tokamak\) itself\. With the greatest risk being around the ability to provide the necessary measurements within a radiative environment\. Given that the greatest challenge will be in the measurement systems being able to meet performance requirements under irradiation, the identification of alternative ways to measure the required parameters is of interest to the STEP Programme\. Measurement systems undergo performance losses and eventual failure under irradiation which results in the inability to meet the requirements of control systems functions - both safety and commercial\. A traditional solution for overcoming challenges to radiation is to develop radiation hard technologies\. For applications to a fusion power plant, there is a concern that the development of a radiation tolerant/hard technology will not be enough, and so alternative approaches should be considered\. This work should aim to identify novel approaches and solutions to this problem - it is essential a solution is found to enable commercial viability of fusion energy power plants\.

## Related contract awards

- [SBRI Competition Fusion Industry Challenges - Novel Concepts for Robust Diagnostics Systems, Sensing and Control](/contracts/ocds-b5fd17-4ca65c93-da99-4de7-a43a-afcbb86e40a8): United Kingdom Atomic Energy Authority
- [Isolation Transformers](/contracts/ocds-b5fd17-a9eef88c-f5d2-4da4-a421-1c112cfabcc4): United Kingdom Atomic Energy Authority
- [Employee Assistance Programme](/contracts/ocds-b5fd17-a2e8d11a-9970-43cf-9088-a4c30017882c): United Kingdom Atomic Energy Authority
- [Future Materials Campus - Programme Initiation Partnership \(PIP\); Nuclear Client of Choice workstreams](/contracts/ocds-b5fd17-bab6c357-a17c-4e2c-8e45-c7c9f70881df): AWE PLC
- [Quantum Technology Roadmap for Transport to 2030](/contracts/ocds-b5fd17-5a563c1d-632c-4f7d-b3f8-aa672b6642a4): DfTc - Department for Transport
- [Electrical Engineering Design](/contracts/ocds-b5fd17-b2f5a66c-aec1-449d-a7db-522298f970fa): United Kingdom Atomic Energy Authority

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/1dc51d5a-777e-4272-a46e-793e82306316-639861)
