Tender notice
ORE/22/095 - Floating Offshore Wind - Cable Topology Comparison: Risk and Reliability Assessment
Notice details
- Published
- Category
- services
- Buyer region
- Not specified
- Source
- View official notice
Public buyer
Public buyer
Offshore Renewable Energy CatapultTender value£20,000
- Planned startAs published in the notice
- Planned endAs published in the notice
Work description
This project is a technology agnostic high-level study of the costs, risks and opportunities for different cable topology and cable connection methods (including subsea wet mate connectors) for offshore floating wind, in comparison to a more conventional topology in a daisy chain configuration between turbines. This study is important as it aims to answer the following questions: • What topologies will potentially be used for future FOW sites (e.g. daisy chain, fishbone, or star)? • What type of connectors will be required and their current technology readiness level (TRL) in the subsea sector (i.e. what is going to be available in 2025 to 2030)? • What are the expected failure modes and reliability level of cable array topologies using subsea connectors versus conventional daisy chain arrangements? How does this influence the overall array-level system reliability and redundancy? • What are the installation characteristics of the comparative array topologies for installation and disconnection (i.e. required vessels and equipment, time scales, any additional risks and uncertainties)? • What are the comparative purchase, installation and O&M costs for different connector and topology combinations?
Additional information: New Opportunity, ITT documents available free of charge at https://procontract.due-north.com/