# Professional Services Consultancy Framework \(Projects over 2 000 000 GBP\)

> Tender notice from UK public-sector procurement sources.

## Key facts

- Public buyer: [University of Leeds](/buyers/university-of-leeds/contract-awards)
- Published: 11 April 2019
- Planned start: 1 September 2019
- Planned end: 31 August 2023
- Stage: open_tender
- Procurement category: services
- Notice ID: 0753b3ef-3275-4e50-8194-a038868ded27-283275
- OCID: ocds-b5fd17-fd7992ad-1105-4253-b984-09e5c87f24ce

## Description

Text to be corrected in the original notice: Place of text to be modified: IIi\.2\.1 Instead of: Section III\.2\.1 Read: Lot 1 M&amp;E Engineer Mechanical and Electrical Services Engineering and Chartered Mechanical and Electrical Engineering Services \(Potential Suppliers must hold Chartered status of the Chartered Institute of Building Services Engineers \(CIBSE\) or The Association for Consultancy &amp; Engineering, \(ACE\) or equivalent professional body for the profession Where the professional body provides for company designation, the Lead Engineer should individually be a fully qualified member of the professional body\. Assistant Engineers should be members of the professional body\. Where the professional body provides for company designation, each company should hold the qualified status\. Lot 2 C&amp;S Engineer Where the professional body \(IStructE or ICE or equivalent\) provides for company designation, each company should hold the qualified status\. Where the professional body provides for individual designation, the Lead Engineer/professional should individually be a fully qualified member of the professional body\. Assistant Engineers should be members of the professional body Lot 3 Architect Where the professional body \(RIBA or equivalent\) provides for company designation, each company should hold the qualified status\. Where the professional body provides for individual designation, the Lead Architect/professional should individually be a fully qualified member of the professional body\. Assistant Architects should be members of the professional body\. Lot 4 PM: Where the professional body \(APM or RICS or equivalent\) provides for company designation, each company should hold the qualified status\. Lead Project Managers should individually be a fully qualified member of the APM or the RICS, or acceptable equivalent\. Assistant PMs should be members of the professional body\. Lot 5 QS: Each company should hold \(RICS or equivalent\) status as companies\. Lead Cost Consultants should individually be a fully qualified member of the RICS, or acceptable equivalent\. Assistant cost Consultants should be members of the professional body\. Construction consultancy services\.

## Related contract awards

- [GB-Leeds: 202526 5793 Cell Disruptor](/contracts/ocds-b5fd17-e664e96e-1cea-4381-b6ed-cb47d62d4930): University of Leeds
- [202526 5916 - research flight services in the Democratic Republic of Congo](/contracts/ocds-b5fd17-22bb7279-f829-460a-b706-c2f02b0e8406): University of Leeds
- [202425 4810a- Supply of Two high precision gas analysers for CO2, CH4, H2O](/contracts/ocds-b5fd17-47c43e6a-a6fa-4463-a570-945761449cf6): University of Leeds

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/0753b3ef-3275-4e50-8194-a038868ded27-283275)
