Internal reconstruction of 5 Highfield, Ashford-in-the-Water, following property subsidence. Specifications provide all details required along with all appropriate drawings.
Contract Details
- Tender Value
- £250,000
- Stage
- Open Tender
- Published
Timeline
Description
Demolish all internal structure apart from the roof of the existing dwelling. Excavate path at front of house. Saw cut existing concrete roof to outbuilding to remove covered link with the existing dwelling. Underpinning of the existing party wall construction and formation of new concrete perimeter foundations. Form new ground floor beam & block floor and re-plan the internal layout of dwelling including new staircase and first floor construction. Raise front door and porch level. Form new ramped access path to front entrance door. Cover remaining existing outbuilding roof with felt laid to falls. Re-work foul/surface water drainage to suit new layout. Cut back side external steps to form drainage channel. Cutting back of existing tree at front and side of house.
Related Contracts
From This Buyer
From This Supplier
In This Category
- Fencing in Public Park and Open Spaces within Taunton
£57,000 ·
- Estates Capital Project- LittleBrook Anti-Ligature Doors and Associated Hardware
£35,371 ·
- Consultancy re. Replacement of Roof and Solar Panels at Cranleigh Health Centre
£98,415 ·
- DNWP0032/LOT1B/ Lot 1B - Management (Core Team) FY 26/27
£3,150,939 ·
Ref: 4fd0f365-d6ef-4a69-8196-6c8dcb464104-672011 · Sourced from Contracts Finder
View source notice