Carlton Active
£647,343
Contract Details
- Tender Value
- £647,343
- Stage
- Awarded
- Published
- Awarded
Timeline
Description
This requirement is a call-off contract using the UK Leisure Framework https://leisureframework.co.uk/ which is a specialist procurement framework supporting leisure centre building. The contract delivers the Carlton Active pre-construction phase (RIBA Stage 2) and will develop the concept design and establish the detailed feasibility for the redevelopment of the Richard Herrod Centre into a new Leisure, Wellbeing and Community Centre. This stage will define the project brief, confirm the facility mix, undertake technical site surveys, develop outline designs, and prepare the initial cost plan. It will also include early engagement with planning, environmental, and accessibility requirements to inform the concept and secure a clear, deliverable design and budget position for progression to RIBA Stage 3. RIBA 2 A Stage Report Pack including: o A detailed Project Execution Plan, outline risk register, and estimated timeline for project delivery. o A robust budget cost estimate. o Planning 'Pre-App' consultations, if applicable. o Review and proposal of any surveys required to develop the RIBA 4 Technical Design. Outline Architectural Information comprising: o Accommodation Schedule. o Site Plans - Existing and Proposed. o General Arrangement (GA) Plans and Sections. o Concept Massing and Elevations. o 3D Visuals of key external and internal spaces. o Outline Performance Specifications. o FF&E Schedule of Assumptions. Production of Structural Information comprising: o Outline Structural Strategy. o Recommendations on the need for further surveys, assessments or investigations. o Recommendations on statutory and legal approvals required. Production of MEP Services Information comprising: o Outline Mechanical and Electrical Strategy. o Outline Performance Specifications for mechanical, electrical and public health systems. o Preliminary plant space and services distribution layouts (including pool filtration). o Cost confidence MEP cost plan (based on £/m² indicative outline solutions). o Attendance at meetings (site-based or virtual) with coordination between consultants and key subcontractors.
Related Contracts
From This Buyer
- Tyre Supply and Maintenance
£65,000 ·
- Carlton Active - RIBA Stages 3 & 4
£2,029,967 ·
- Mitel Maintenance and Support Contract
£28,685 ·
- Agency Contract for ICT Business Operations Manager
£133,110 ·
From This Supplier
- North Northamptonshire Council - Marketing Support Package 2025 - 2027
£65,000 ·
- Provision of RIBA Stage 5 professional, design and construction services for the delivery of a new leisure centre in Kingston town centre
£40,400,000 ·
- Leisure Needs Assessment, Hythe Pool Review and Feasibility Study
£44,500 ·
- Feasibility Studies for Leisure Centres
£396,292 ·
In This Category
Ref: 2c05a0b2-aaa9-4fd6-94ab-685bfe76467d-870003 · Sourced from Contracts Finder
View source notice