Lincolnshire Lakes - Highways Scheme
Contract Details
- Stage
- Open Tender
- Published
Timeline
Description
The scheme comprises of the following main elements: - • A new at-grade roundabout located on the existing M181 approximately 140m north of the B1450 (Burringham Road) overbridge. • The motorway to the south of the new roundabout is to be renamed as 'M180', while the existing motorway to the north will be de-trunked and renamed to become 'A1077', all-purpose dual carriageway (the de-trunking works are to be undertaken by others). • Two new link roads are proposed to the east and west of this proposed roundabout. • The new link roads connect into two new roundabouts, one east and one west of the M181. These roundabouts provide access to the planned development sites. • The new link roads then tie-back into the existing B1450. • Online improvements to the existing Burringahm Road to the east of the scheme through to the roundabout adjacent to the Asda Supermarket. • Improvement works to this roundabout to create additional capacity • The existing section of the B1450 road and overbridge between the new link road connections would be retained for non-motorised users (NMUs) and will be connected into new NMU routes that enable access to the planned development sites. Works are to be provided under a design and construction contract. The design is substantially complete, however there are several design activities that are to be undertaken and these are described in Volume 3 Part 1 Works Information WI300. The current design agreement with Alan Wood and partners is to be novated into the design and construction contract. A copy of the design agreement and form of novation will be issued to all registered tenderers upon commencement of the tender period. Additional information: Is a Recurrent Procurement Type? : No
Related Contracts
From This Buyer
- Highgate Cemetery Architectural Projects Competition - Stage 1
- Highgate Cemetery Landscape Competition - Stage 1
- Architectural services for the redevelopment of Rutland Mills (to be known as Tileyard North) - AWARD
£239,256 ·
- Urgent roof repair to Outer Gatehouse, Buckden Towers, Buckden, Cambs, PE19 5TA.
From This Supplier
In This Category
- Installation Services, Small Works and Reactive Call Outs
£112,110 ·
- M62 Red Lane Dike Bridge Refurbishment - Ground Investigation
£134,612 ·
- Ebury Phase 2 Marking Suite Fitout Contractor
£500,000 ·
- CA18338 - Chesterfield College Training & Production kitchen ducting, heating and control panel
£79,695 ·
Ref: 612a15de-8d34-4da0-b7f5-86ee2cf0c6ad-405226 · Sourced from Contracts Finder
View source notice