Chemistry Building Strip and Fit Out - Levels 2 & 3 Main Works
£11,738,571
Contract Details
- Tender Value
- £11,738,571
- Stage
- Awarded
- Published
- Awarded
Timeline
Description
The contract comprises an extensive refurbishment of the 2nd and 3rd floors of the Chemistry Building. The works include the creation of new generic flexible laboratory spaces including new fume cupboards and fixed benching. Each lab area contains a dedicated write-up space with glazed screens for visibility throughout the lab. Works also include the extension of existing extract ducts to service the floor and with other associated services for the laboratory. The contractor was appointed using the Crown Commercial Services RM6088 Construction Works and Associated Services framework. The contract value includes £214,541 of works procured under a PCSA using the same framework.
Related Contracts
From This Buyer
From This Supplier
- Chemistry Building - Floor 1 - Main Works
£7,053,445 ·
- Chemistry Building - Dover Street Wing
£120,000 ·
- Soldier's Centre at Alexander Barracks, Pirbright
£9,197,247 ·
In This Category
- PAHT - ITU Dirty Utility Refurbishment
£52,000 ·
- HD029-25 Peterhouse Road Grimsby
£204,455 ·
- DNWP0019/LOT1B/ WAGR / PIE ILW - Detailed Design
£2,468,738 ·
- PRP318 Glenholme - Refurbishment Works
£1,125,847 ·
Ref: 62c57243-a340-409e-9a02-c000e7297c2b-674492 · Sourced from Contracts Finder
View source notice